In conjunction with DBCA, Track Care performed a trial run of the sign placement at Mt Augustus and the Kennedy Ranges. We found that training is required to be able to place the signage consistently. This training is being organised and should occur sometime after September 2020. The training may happen on site while working on the walk trails.
Similar Posts
Elation in “The Wandoo”
Our Project, which was blessed by a beautiful day, had been to allow vehicles to keep fully within the…
Hema Maps and Track Care WA
Earlier this month, Track Care Ian, Pierre and Bryce from Hema Maps to increase awareness within Hema Maps of…
CSR Maintenance Trip 2023
With the CSR again open for business and a bunch of jobs to attend to after last year’s Audit…
Wandoo Cleanup Report Oct 7 & 8 2023
There is something immensely satisfying about being confronted by a large jumble of trunks, branches and leaves; methodically setting…
APLA Club Guest Speaker February Meeting
Calling all those who have an interest in prospecting while on your travels around this wonderful state. Do we…
Two projects at Wandoo Wetlands for November
Aim: Sign and bollard installation as well as a bit of a clean up. PLUS – A fun, guided…